Canada · Alberta
Construction estimating for Alberta contractors.
Cost estimates and quantity takeoffs for general contractors and subcontractors tendering work in Calgary, Edmonton, Red Deer and across Alberta, measured in the units your drawings use and taken off to the 2023 Alberta Edition codes and the standards the set cites.
- 3 recent Alberta projects, named below
- Priced to the code your drawings cite
- Metric or imperial, quoted in Canadian dollars
Working hours
Quotes during your working day.
Monday to Friday, 8 am to 5 pm Pacific, which is 9 am to 6 pm Mountain.
- 01
Quote within 30 minutes during business hours
- 02
Typically 1–2 business days
- 03
Excel and PDF delivery
Recent projects
3 projects we estimated in Alberta.
From 2025 and 2026. We prepared the estimate, takeoff or shop drawings for a contractor bidding each one.
| Project | Scope | Year |
|---|---|---|
| Demolition project, Red Deer | ScopeDemolition | Year2026 |
| St. John XXIII School renovation, Edmonton | ScopeMechanical and painting | Year2026 |
| Miranda Apartments, Calgary | ScopeGC and MEP | Year2025 |
Local rules
What changes on a Alberta estimate.
Checked against the state or provincial sources in October 2026. The drawings and specification always decide what is priced.
National Building Code – 2023 Alberta Edition
Alberta's building code has been the National Building Code – 2023 Alberta Edition since May 1, 2024, when it replaced the 2019 Alberta Edition, and the National Fire Code – 2023 Alberta Edition came into force the same day. A second printing of both was published in August 2026. We take off to the edition and printing the drawings cite.
Energy: NECB 2020 and Section 9.36
The National Energy Code of Canada for Buildings 2020 has applied to Alberta buildings since May 1, 2024, and housing and small buildings follow Section 9.36 of the Alberta building code. Envelope, glazing and mechanical quantities follow the compliance path the drawings show.
Electrical: the 2024 Canadian Electrical Code
Alberta declared CSA C22.1-24, the 26th edition of the Canadian Electrical Code, in force on April 1, 2025. Electrical estimates follow the edition the drawings and specifications cite. Permits come from the municipality or agency accredited under the Safety Codes Act, and electrical permits are issued to a master electrician.
GST only
Alberta has no provincial sales tax, so materials carry the 5% federal GST and nothing else. Tax stays on its own line, so you can see the estimate before and after it.
Holdback and prompt payment
Under Alberta's Prompt Payment and Construction Lien Act, the owner holds back 10% of the value of work done for 60 days after substantial performance, or 90 days where the work is mainly concrete. A proper invoice is payable within 28 days, and a contractor pays its subcontractors within 7 days of being paid. The holdback changes cash flow rather than cost, so it belongs in the bid's assumptions.
Trades
The trades behind these Alberta projects.
Every trade we price is available on Alberta work, from single-trade takeoffs to full GC estimates with MEP. These are the ones on the projects above.
Priced in Alberta
Questions Alberta contractors ask us
Do you estimate projects in Alberta?
Do you quote in Canadian dollars?
When can we reach you?
Which code do you take off to?
Alberta
Tender closing soon? Send the drawings.
Send the drawings, the scope and the bid date. We reply with a quote within 30 minutes during business hours.