Quantity Takeoff

Quantity takeoffs measured from your drawings.

Quantity takeoffs for general contractors and subcontractors: every item measured from your drawings in PlanSwift, organized by CSI division, with the sheet, the waste factor and any assumption shown on its line.

  • Measured in PlanSwift
  • Organized by CSI division
  • Excel and marked-up PDF

Scope Measurement

Every quantity traced to the sheet it came from.

Each line names the drawing sheet, gives the measured quantity and the waste factor separately, and carries its assumptions, so your estimator can check it against the set and price it.

  • 01

    Sheet reference on every line

  • 02

    Waste shown separately

  • 03

    Assumptions labelled

Overview

Quantity takeoffs you can check and price.

We measure the quantities on your drawings and send them in a form your estimator can price with your own costs: an Excel takeoff organized by CSI division, and the marked-up drawings showing what was measured.

  • The complete general contractor scope, with MEP
  • Or a single trade, from sitework to finishes
  • Metric drawings measured in metric

Who it is for

Who this service supports.

01

General contractors

02

Subcontractors

03

Estimating teams

04

Builders

05

Procurement teams

06

Developers reviewing quantities

Scope

What is included.

01

Quantities measured in PlanSwift from your drawing set

02

Counts, lengths, areas, volumes and weights in SF, LF, SY, CY, EA, LBS and TONS

03

Waste factors applied and shown on each line

04

Drawing sheet and detail references for each line

05

Assumptions labelled on the line they affect

Deliverables

What you receive.

01

Quantity takeoff in Excel, organized by CSI division

02

Marked-up PDF of the drawings showing every measured area and count

03

Quantities with and without waste

04

Excel and PDF files

Outcomes

What it changes in your workflow.

01

Quantities ready to price with your own unit costs and crews

02

A marked-up set that shows what was measured, and what was not

03

Material quantities for ordering, with waste shown on each line

04

A measured baseline to check subcontractor and supplier quotes against

Standards

How we handle quantity takeoffs.

01

Every line carries the drawing sheet and detail it came from, so any quantity can be found on the set.

02

Measured quantities and waste factors are shown separately, so a different waste allowance changes one number, not the whole takeoff.

03

Where the drawings leave something open, the assumption is labelled on the line it affects instead of being buried in a total.

Project types

Where this service fits.

01

Pre-bid quantity reviews

02

Material planning before procurement

03

Scope checks for negotiated projects

04

Takeoff support for estimating teams under deadline

Questions contractors ask us

Is construction takeoff separate from estimating?

It can be. Some teams only need measured quantities, while others use the takeoff as the base for a full estimating workflow.

Can the takeoff files support procurement review too?

Yes. The deliverables are organized so teams can use them for material planning and scope verification as well as estimating.

What software do you use for takeoffs?

PlanSwift. You receive the marked-up drawings as a PDF alongside the Excel quantities, so every number can be traced to the sheet it came from.

How long does a takeoff take?

Typically 1–2 business days. Larger or more complex drawing sets can take 7–15 days. We confirm the date with the fee before work starts.

How much does a quantity takeoff cost?

Takeoff work is billed at $180–$250 per estimator per day, depending on project complexity; simpler single-trade takeoffs sit at the lower end of the range. You confirm the fee for your scope before any work starts.

Which trades do you take off?

The complete general contractor scope with MEP, or a single trade: demolition, sitework, concrete, masonry, steel, wood framing, roofing, waterproofing, insulation, doors and windows, drywall, ceilings, tile, flooring, painting, specialties, and mechanical, electrical and plumbing.

Do you take off mechanical, electrical and plumbing drawings?

Yes. HVAC equipment, ductwork and piping, plumbing fixtures and piping, and electrical power and lighting are measured from the MEP drawings and organized under their own CSI divisions, alongside the architectural and structural takeoff.

Quantity Takeoff

Need the quantities? Send the set.

Share the drawings and E4 can help organize clear quantity takeoffs for estimating, review, and material planning.