What is a bid bond in construction?

A bid bond is a surety's guarantee that, if your bid is accepted, you will sign the contract and furnish the performance and payment bonds, or the surety pays the owner the difference, up to the bond amount. Here is where it shows up in the bidding documents, how its amount is set, what forfeits it, and what it means for the estimate behind the bid.

  • What the bond promises, under AIA A310 and A701
  • How the amount is set, including the federal rule
  • What forfeits it, and what it means for the estimate

Written by

Navtej, Chief Estimator

B.Sc. in Civil Engineering, Master's in Quantity Surveying. Runs the estimating department at E 4 Estimators.

  • 01

    Published November 10, 2026

  • 02

    Updated November 11, 2026

  • 03

    10 min read

01

The short answer

A bid bond is a three-party guarantee that goes in with the bid. The contractor is the principal, the owner is the obligee, and the surety stands behind the promise. The promise is narrow: if the owner accepts the bid within the time the bidding documents allow, the contractor will sign the contract at the bid price and furnish the performance and payment bonds the documents call for. If it does not, the surety is liable to the owner up to the amount of the bond.

It is not a performance bond and it pays nobody for work. It protects the owner against one thing: a low bidder who walks away, leaving the owner to award the job at a higher price. The standard US form is AIA Document A310-2010, Bid Bond; in Canada it is CCDC 220. Federal construction solicitations require a bid guarantee whenever performance and payment bonds are required, which under the Bonds statute (formerly the Miller Act) means any construction contract over $150,000.

02

Where the bid bond shows up

On a private job built on AIA documents, the requirement sits in AIA A701-2018, Instructions to Bidders. Section 4.2.1 is where the owner inserts the form and amount of bid security. Section 4.2.3 says that a surety bond is written on A310 unless the bidding documents provide otherwise, that the attorney-in-fact signing for the surety attaches a certified and current copy of an acceptable power of attorney, and that the surety must be lawfully authorized to issue bonds where the project is located. Questions about the documents before bid day go to the architect by the route the RFI guide describes.

On federal work the requirement is the provision at FAR 52.228-1, Bid Guarantee. FAR 28.101-1 requires a bid guarantee whenever performance and payment bonds are required, and on construction only a separate bid guarantee will do, not an annual bond. Failure to furnish it in the proper form and amount by bid opening may be cause for rejection, and in sealed bidding FAR 28.101-4 makes rejection the rule, with a short list of waived defects, such as a bond the offeror forgot to sign or a wrong date. A power of attorney missing at bid opening is a matter of responsiveness under FAR 28.101-3, judged as of bid opening.

State, provincial and local public owners write their own instructions, with the bond form, the amount and the surety's qualifications in them; private owners choose. Read the advertisement, the instructions and the bid form, because each can carry part of the requirement.

03

How the amount is set

The amount, called the penal sum, is stated in the bidding documents as a percentage of the bid or as a fixed figure. A701 leaves it for the owner to fill in at Section 4.2.1. The federal provision reads "___ percent of the bid price or $___, whichever is less", and FAR 28.101-2 tells the contracting officer to set a figure adequate to protect the Government, at least 20 percent of the bid price but not more than $3 million.

What the surety pays is a different number. Under A310 the bond's condition is met if the contractor signs the contract and furnishes the bonds, or pays the owner the difference, not to exceed the amount of the bond, between the bid and the larger amount for which the owner in good faith contracts with another party. So the bond amount is a ceiling, and the owner's measure of loss is the spread to the next bidder. A701 Section 4.2.2 frames it differently: a bidder who refuses to sign or fails to furnish the bonds forfeits the amount of the bid security as liquidated damages, not as a penalty. Either way, the whole penal sum is on the table once the bid goes in. On federal work a defaulted bidder is also liable for any cost of acquiring the work above its bid, with the guarantee offsetting the difference.

Bid bondWhat it guaranteesThe bidder will sign the contract and furnish the other bonds if its bid is acceptedAmountA percentage of the bid or a fixed sum; federal: at least 20% of the bid, up to $3 millionWhen it is furnishedWith the bid, by the time of openingFormsAIA A310-2010; CCDC 220; FAR 52.228-1
Performance bondWhat it guaranteesThe contractor will perform the contractAmountThe contract sum under A701 unless stated otherwise; federal: 100% of the contract priceWhen it is furnishedAfter award: within three days of signing under A701 Section 7.2.1; before notice to proceed on federal workFormsAIA A312-2010; CCDC 221; FAR 28.102
Payment bondWhat it guaranteesSubcontractors and suppliers of labor and material will be paidAmountSame basis; federal: 100%, and never less than the performance bondWhen it is furnishedWith the performance bondFormsAIA A312-2010; CCDC 222; FAR 28.102

A701 Section 7.1.2 settles who pays for the performance and payment bonds: if the bidding documents stipulate them, their cost is included in the bid; if the owner asks for them after bids are in, the cost is added to the bid in setting the contract sum. The federal threshold is in FAR 28.102-1: performance and payment bonds on any construction contract over $150,000, and between $35,000 and $150,000 two or more alternative payment protections chosen by the contracting officer. The surety stays in the picture after award: its consent is needed before retainage is released, as the retainage guide explains.

04

What forfeits a bid bond, and what does not

The bond is called when the owner accepts the bid within the acceptance period and the bidder refuses to sign or cannot deliver the performance and payment bonds. On federal work FAR 52.228-1(d) gives the successful bidder 10 days after receiving the forms to execute the documents and furnish the bonds, after which the contracting officer may terminate for default. Under A701 Section 4.2.4 the owner may hold the security of the bidders under consideration until the contract is signed and the bonds are in, the period for withdrawing bids has run, or all bids are rejected.

Several things do not forfeit it under A701. Withdrawing before the deadline by notice to the party receiving bids (Section 4.4.1). A clerical error found after opening and reported to the architect within two days, or within the period local law allows, with evidence to the architect's reasonable satisfaction: the bid is withdrawn and not resubmitted, and the documents state what happens to the security (Section 4.4.3). Withdrawing after the owner or architect objects to a proposed subcontractor or supplier (Section 6.3.3). And the owner's failure, when asked, to show that it has made financial arrangements to pay for the work (Sections 4.2.2 and 6.2).

Federal sealed bidding has its own mistake procedure. FAR 14.407 requires the contracting officer to examine bids for mistakes and to ask a bidder to verify its bid when it is so far below the other bids or the Government estimate as to suggest an error. With clear and convincing evidence of the mistake and the intended bid, the bid may be corrected; with evidence of the mistake alone, the bidder may be allowed to withdraw. Verify when asked, and never confirm a number you have not re-checked.

Watch the acceptance period too. Under A310 the surety waives notice of extensions of the time to accept bids up to 60 days in aggregate; anything longer needs its consent, so ask before you agree to hold the price.

05

What the bid bond means for the estimate

A bid bond is a promise to build the job at the number on the bid form. Everything the surety stands behind comes out of the estimate, so the estimate has to be one you can sign for: a complete quantity takeoff, pricing that matches the specification, and subcontractor quotes that cover the scope. A low number that wins because of a missed scope is the exact loss the bond exists to cover.

  • Check the bid against your bonding capacity before the takeoff starts. The surety sets a limit for a single job and for all bonded work in progress, and a bid you cannot bond is estimating hours wasted.
  • Carry the performance and payment bond premium where the bid form puts it: on its own line if the form has one, otherwise in general conditions with the insurance. A701 Section 7.1.2 puts the cost in the bid when the documents call for bonds. Get the premium from your surety agent, not from a rule of thumb.
  • Ask whether the bid bond can state its amount as a percentage of the amount bid. Then the last-minute price does not hold up the form, and a bid resubmitted at a higher figure is still covered (A701 Section 4.4.2).
  • Keep the surety's paperwork with the bid: the signed bond, the power of attorney, and the surety's authorization in the project's state or province, because A701 Section 4.2.3 and FAR 28.101-3 turn on them.

06

Mistakes that cost contractors money

  • Finding out on bid day that the job needs a bond the firm cannot get, after a week of takeoff.
  • Submitting the bond unsigned, undated or without the power of attorney. On federal sealed bids an unsigned or misdated bond can be waived under FAR 28.101-4; a missing power of attorney is not on that list.
  • Pricing the performance and payment bonds nowhere, because the instructions put their cost in the bid (A701 Section 7.1.2) and nobody read Article 7.
  • Leaving a bid open past the surety's 60-day waiver under A310 without asking the surety, or confirming a bid the contracting officer asked you to verify without re-checking the takeoff.

07

A checklist before bid day

  • The bid security clause: form, amount, and whether a surety bond, a certified check or a letter of credit is acceptable
  • The bond form required: A310, CCDC 220, the owner's own form, or the federal provision
  • The surety's authorization in the project's jurisdiction, and a current certified power of attorney
  • Whether performance and payment bonds are stipulated, their penal sum (A701 Section 7.1.4: the contract sum unless stated otherwise), and where their cost goes in the bid
  • The bid against the firm's single-job and aggregate bonding limits

08

Where we fit

A bid bond puts the whole bid behind a promise to perform, so the estimate under it has to be complete. Our construction cost estimates are organized by CSI division with quantities, units, material and labor on every line, and our quantity takeoffs list every measured item, so the scope can be checked before the bond is signed. The estimating fee is $180–$250 per estimator per day, by project complexity; see how our fees work. The sample estimates show the level of detail.

We estimate for contractors across the United States and Canada. Send the drawings and we confirm the scope, fee and delivery date before work starts.

About the author

Navtej, Chief Estimator

B.Sc. in Civil Engineering, Master's in Quantity Surveying. Runs the estimating department, sets the standards every estimate is checked against and reviews high-stakes bids.

Meet the team

Questions contractors ask

What is a bid bond in construction?

A guarantee from a surety, submitted with the bid, that the bidder will sign the contract at its bid price and furnish the performance and payment bonds if the owner accepts the bid in time. If the bidder does not, the surety is liable to the owner up to the bond amount.

How much is a bid bond?

The owner sets the amount in the bidding documents, as a percentage of the bid or a fixed sum. On federal work FAR 28.101-2 requires at least 20 percent of the bid price, capped at $3 million. What the bond costs you is set by your surety and is separate from the premium on the performance and payment bonds that follow.

What is the difference between a bid bond and a performance bond?

A bid bond guarantees that the bidder will enter into the contract and furnish the other bonds; it matters only between bid opening and contract signing. A performance bond guarantees performance of the contract itself, and a payment bond that subcontractors and suppliers will be paid. Under A701-2018 those two are written on A312 and delivered within three days of signing.

What happens if the low bidder refuses to sign the contract?

Under A310 the surety pays the owner the difference, up to the bond amount, between the bid and the larger amount for which the owner contracts in good faith with another party. Under A701 Section 4.2.2 the bid security is forfeited as liquidated damages, and on federal work the guarantee offsets the excess cost of acquiring the work.

Can you withdraw a bid without losing the bid bond?

Before the deadline, yes: A701 Section 4.4.1 allows withdrawal by notice. After opening, a bidder who finds a clerical error and notifies the architect within two days, with evidence, may withdraw under Section 4.4.3, and the documents say what then happens to the security. Federal sealed bidding allows correction or withdrawal under FAR 14.407 with clear and convincing evidence of the mistake.

Do subcontractors need bid bonds?

Only when the contractor asks for one with the subcontract bid. A310 provides for it: when the bond is issued for a subcontractor's bid to a contractor, the form's Contractor means the subcontractor and its Owner means the contractor.

Keep reading

Where this guide leads.

The services and sample estimates behind this guide, and the guides that pair with it.

Next bid

Bid due soon? Send the drawings.

Send the drawings, the scope and the bid date. We reply with a quote within 30 minutes during business hours.