Cost Estimating

Construction cost estimates you can bid on.

Professional cost estimating support for contractors, builders, and developers who need dependable pricing clarity and bid-ready outputs.

  • Construction cost estimating
  • Priced by CSI division
  • Structured estimate outputs

Pricing Clarity

Dependable numbers, organized for review.

The workflow keeps scope and pricing clear so teams can move from review into budgeting or bidding with less friction.

  • 01

    Scope-based cost breakdowns

  • 02

    Budget and bid support

  • 03

    Excel and PDF delivery

Overview

Construction cost estimating built around pricing clarity.

This service turns project information into organized pricing visibility for budgeting, scope review, and bid preparation.

  • Construction cost estimating
  • Pricing clarity
  • Budgeting and bid support
  • Structured outputs

Related services

Quantity Takeoff

Detailed quantity takeoffs that improve scope understanding and support stronger estimating decisions.

Electrical

Electrical estimating and takeoffs: power and lighting quantities, measured and priced.

HVAC & Mechanical

HVAC and mechanical estimating: equipment, ductwork and piping quantities, measured and priced.

Guide: Time and Materials (T&M) Contract in Construction

A time and materials contract pays fixed hourly labor rates plus the cost of materials. How the rates, the ceiling price, T&M tickets and change orders work.

Guide: Cost-Plus Contract in Construction: Fee, GMP and Costs

A cost-plus contract pays the contractor the cost of the work plus a fee. How the fee, the guaranteed maximum price and reimbursable costs work on AIA forms.

Guide: What Is a Performance Bond? Payment Bonds and Miller Act

A performance bond guarantees the contract is completed; a payment bond, that subs and suppliers are paid. What A312 and the Miller Act require, with deadlines.

Guide: What Is a Bid Bond in Construction? Amount and Forfeiture

A bid bond guarantees the low bidder will sign the contract and furnish performance and payment bonds. What A310, A701 and the FAR say, and what forfeits it.

Guide: What Is Retainage in Construction? Rates and Release

Retainage is the part of each progress payment held back until the work is done. What A201, the G702 and FAR say, when it is released, and how to plan for it.

Guide: Schedule of Values in Construction: How to Build One

A schedule of values splits the contract sum into the lines you bill against each month: how to build one from the estimate, the G703 columns and what to avoid.

Guide: What Is a Change Order in Construction? How to Price One

A change order changes the work, price or time after the contract is signed. How A201 and the G701 form handle it, how to price one, and what gets it cut.

Guide: Construction Estimate Types: ROM, Parametric, Detailed

The types of construction estimates, from a rough order of magnitude to a detailed bid: what each one needs, the AACE accuracy ranges, and when to use which.

Guide: General Conditions in Construction: What They Include

General conditions in construction: how they differ from Division 01 and overhead, the items contractors carry, and how to price them from the schedule.

Guide: CSI MasterFormat Divisions: Full List for Estimators

All 50 CSI MasterFormat divisions, what each one covers, the old 16-division numbers mapped to today's, and where scope gaps hide between divisions.

Who it is for

Who this service supports.

01

General contractors

02

Subcontractors

03

Builders

04

Developers

05

Construction managers

06

Owners pricing new project scopes

Scope

What is included.

01

Quantities measured in PlanSwift from your drawing set

02

Material and labor pricing for each line, with waste factors

03

Labor man-hours from journeyman, supervisor and unskilled rates

04

Profit, contingency and sales tax shown as separate lines

05

Assumptions labelled on the line they affect

Deliverables

What you receive.

01

Bid summary priced by CSI division

02

Detailed estimate with quantities, units, material and labor

03

Marked-up PDF of the drawings showing what was measured

04

Excel and PDF files

Outcomes

What it changes in your workflow.

01

Better pricing visibility

02

Faster bid preparation

03

More organized budgeting decisions

04

Clearer cost communication

Standards

How we handle cost estimating.

01

E4 keeps estimate structure clear enough for quick review and markup.

02

The output is built for practical budgeting and bid workflows.

03

Communication stays direct when revisions or clarifications matter.

Project types

Where this service fits.

01

Concept budgets for new developments

02

Bid-stage pricing for contractor submissions

03

Scope pricing reviews before procurement decisions

04

Owner-side pricing checks on new project scopes

Projects

Recent projects we priced.

From 2025 and 2026. We prepared the estimate or takeoff for a contractor bidding each one.

Eske shop and officeLocationMichiganYear2026
Fredrick StreetLocationNorth CarolinaYear2026
Hanover HondaLocationMassachusettsYear2026
New secondary school, RocklandLocationNew YorkYear2026
Ontario Police CollegeLocationOntarioYear2026
Sims ResidenceLocationTennesseeYear2026
Southridge High SchoolLocationVirginiaYear2026
Tessiatore AdditionLocationNew JerseyYear2026
Medicus CourtLocationFloridaYear2025
Miranda Apartments, CalgaryLocationAlbertaYear2025

Questions contractors ask us

What kind of estimating output is typically included?

Most scopes include structured estimate sheets, organized pricing by scope, and Excel or PDF deliverables prepared for review.

Can cost estimating support both budgets and bids?

Yes. The service is positioned to support early budgeting as well as bid preparation when clearer pricing structure is needed.

What software do you use?

Quantities are measured in PlanSwift. Every estimate comes with a marked-up PDF of the drawings, so you can see exactly what was measured.

How long does an estimate take?

Typically 1–2 business days. Larger or more complex drawing sets can take 7–15 days. We confirm the date with the fee before work starts.

How much does a cost estimate cost?

Estimating is billed at $180–$250 per estimator per day depending on project complexity. You get a fixed quote for the scope before any work starts.

Cost Estimating

Bid due soon? Send the drawings.

Send the project scope and E4 can help organize dependable pricing support for your next budget or bid.