CSI MasterFormat divisions: the full list, and how estimates use it.
MasterFormat sorts construction work into 50 numbered divisions. Specifications are written in it, subcontractors bid by it, and a good estimate is summarized by it. Here is the full list, what each division covers, and where scope falls between them.
- 50 divisions, numbered 00 to 49
- The old 16-division numbers mapped to today's
- Where scope gaps hide between divisions
Written by
Navtej, Chief Estimator
B.Sc. in Civil Engineering, Master's in Quantity Surveying. Runs the estimating department at E 4 Estimators.
- 01
Published October 26, 2026
- 02
Updated October 27, 2026
- 03
7 min read
01
What MasterFormat is
MasterFormat is the standard list of numbers and titles for organizing construction specifications and other project documents in the United States and Canada. It is published jointly by the Construction Specifications Institute (CSI) and Construction Specifications Canada (CSC), and it is the numbering behind most project manuals, bid forms and estimates.
It works in levels. A division groups related work, such as Division 09, Finishes. Inside a division, each section has a six-digit number in three pairs: 09 21 16 is Gypsum Board Assemblies, 03 30 00 is Cast-in-Place Concrete and 23 31 13 is Metal Ducts. The first pair is always the division.
Until 2004 MasterFormat had 16 divisions. The 2004 edition expanded it to 50, numbered 00 to 49, and reserved some numbers so the format has room to grow. That change is why you still hear mechanical work called "Division 15": the old numbering lives on in conversation long after it left the specifications.
02
The full list of divisions
The divisions sit in two groups, and the larger one is split into subgroups. Numbers missing from the list, such as 15 to 19, 20, 24 and 29, are reserved for future use. Where we estimate a division's work as its own trade, the row links to that page.
Procurement and Contracting Requirements Group
| Division | Title | What it covers |
|---|---|---|
| 00 | TitleProcurement and Contracting Requirements | What it coversBid solicitation, instructions to bidders, bid forms, the agreement and the conditions of the contract. It is not built work, but it sets the bonds, insurance, allowances and alternates the bid must carry. |
Specifications Group: General Requirements Subgroup
| Division | Title | What it covers |
|---|---|---|
| 01 | TitleGeneral Requirements | What it coversSummary of work, allowances, alternates, unit prices, submittal procedures, quality requirements, temporary facilities and controls, and closeout. Much of a contractor's general conditions cost comes from this division. General conditions, explained |
Facility Construction Subgroup
| Division | Title | What it covers |
|---|---|---|
| 02 | TitleExisting Conditions | What it coversSurveys and investigations, hazardous material remediation, and demolition. Demolition estimating |
| 03 | TitleConcrete | What it coversFormwork, reinforcing, cast-in-place concrete, precast concrete and grouting. Concrete estimating |
| 04 | TitleMasonry | What it coversBrick and concrete block (CMU), stone, mortar and grout, masonry reinforcing and anchors. Masonry estimating |
| 05 | TitleMetals | What it coversStructural steel, steel joists and deck, cold-formed metal framing, and fabrications such as stairs, railings and lintels. Steel estimating |
| 06 | TitleWood, Plastics, and Composites | What it coversRough carpentry and framing, sheathing, finish carpentry, architectural woodwork and casework. Framing estimating |
| 07 | TitleThermal and Moisture Protection | What it coversWaterproofing and dampproofing, insulation, air and vapor barriers, roofing, flashing and sheet metal, firestopping and joint sealants. Roofing, waterproofing and insulation estimating |
| 08 | TitleOpenings | What it coversDoors and frames, door hardware, windows, storefronts and curtain wall, glazing and louvers. Doors and windows estimating |
| 09 | TitleFinishes | What it coversGypsum board and non-structural metal framing, plaster, tile, ceilings, flooring, wall coverings, painting and coatings. Drywall, ceiling, tile, flooring and painting estimating |
| 10 | TitleSpecialties | What it coversToilet compartments and accessories, signage, lockers, fire extinguishers and cabinets, wall and corner guards. Specialties estimating |
| 11 | TitleEquipment | What it coversBuilt-in equipment such as foodservice, laboratory, athletic, loading dock and residential appliances. |
| 12 | TitleFurnishings | What it coversManufactured casework, window treatments, furniture, entrance mats and site furnishings. |
| 13 | TitleSpecial Construction | What it coversSpecial-purpose rooms, pre-engineered structures, swimming pools and radiation protection. |
| 14 | TitleConveying Equipment | What it coversElevators, escalators, moving walks, lifts and dumbwaiters. |
Facility Services Subgroup
| Division | Title | What it covers |
|---|---|---|
| 21 | TitleFire Suppression | What it coversSprinkler and standpipe systems, fire pumps and other fire-extinguishing systems. Fire sprinkler shop drawings |
| 22 | TitlePlumbing | What it coversPlumbing piping, fixtures, domestic water heaters and pumps, and plumbing equipment. Plumbing estimating |
| 23 | TitleHeating, Ventilating, and Air Conditioning (HVAC) | What it coversDuctwork, HVAC piping, air distribution, air handling and rooftop units, and HVAC controls. HVAC and mechanical estimating |
| 25 | TitleIntegrated Automation | What it coversBuilding automation networks and the controls that tie building systems together. |
| 26 | TitleElectrical | What it coversService and distribution, conductors and raceway, wiring devices, lighting, grounding and standby generators. Electrical estimating |
| 27 | TitleCommunications | What it coversStructured cabling, voice and data systems, audio-video and other communications systems. |
| 28 | TitleElectronic Safety and Security | What it coversAccess control, video surveillance, intrusion detection, and fire detection and alarm. |
Site and Infrastructure Subgroup
| Division | Title | What it covers |
|---|---|---|
| 31 | TitleEarthwork | What it coversSite clearing, grading, excavation and fill, erosion and sedimentation control, shoring, and piles and other special foundations. Sitework estimating |
| 32 | TitleExterior Improvements | What it coversPaving, curbs and gutters, fences and gates, site retaining walls, irrigation and planting. Sitework estimating |
| 33 | TitleUtilities | What it coversSite water, sanitary sewer and storm drainage, and site electrical and communications utilities. |
| 34 | TitleTransportation | What it coversRailways, roadway construction, traffic signals and other transportation work. |
| 35 | TitleWaterway and Marine Construction | What it coversShoreline protection, docks, dredging, dams and other waterway and marine work. |
Process Equipment Subgroup
| Division | Title | What it covers |
|---|---|---|
| 40 | TitleProcess Interconnections | What it coversThe piping, ducts and controls that connect industrial process equipment. |
| 41 | TitleMaterial Processing and Handling Equipment | What it coversConveyors, cranes and hoists, and bulk material processing equipment. |
| 42 | TitleProcess Heating, Cooling, and Drying Equipment | What it coversIndustrial heating, cooling and drying equipment. |
| 43 | TitleProcess Gas and Liquid Handling, Purification, and Storage Equipment | What it coversProcess pumps, compressors, tanks and purification equipment. |
| 44 | TitlePollution and Waste Control Equipment | What it coversEquipment that controls air pollution, noise and process waste. |
| 45 | TitleIndustry-Specific Manufacturing Equipment | What it coversEquipment made for a particular manufacturing industry. |
| 46 | TitleWater and Wastewater Equipment | What it coversTreatment equipment for water and wastewater plants. |
| 48 | TitleElectrical Power Generation | What it coversPower plant generation equipment, such as hydroelectric, solar, wind and fuel-cell systems. A building's standby generator stays in Division 26. |
03
The old 16-division numbers you still hear
Older specifications, cost books and many conversations still use the pre-2004 numbers. These are the ones that moved:
| You hear | Before 2004 | Today |
|---|---|---|
| Division 2 | Before 2004Site Construction, including demolition | Today02 Existing Conditions, 31 Earthwork, 32 Exterior Improvements, 33 Utilities |
| Division 13 | Before 2004Special Construction, which then also held fire suppression, detection and alarm, and building controls | Today13 Special Construction; fire suppression moved to 21, building automation to 25, and fire alarm and security to 28 |
| Division 15 | Before 2004Mechanical: plumbing, HVAC and fire protection piping | Today21 Fire Suppression, 22 Plumbing, 23 HVAC |
| Division 16 | Before 2004Electrical | Today26 Electrical, 27 Communications, 28 Electronic Safety and Security |
Divisions 3 to 12 kept their numbers, with a leading zero and a few new titles: Division 6 became Wood, Plastics, and Composites, and Division 8 became Openings.
04
How estimates use the divisions
A bid summary sorted by division lets you compare your number with the subcontractor quotes you receive, because those arrive organized the same way. It also shows an owner or general contractor in one page where the money is: concrete and steel on a new structure, finishes on an interior fit-out.
Our estimates follow the same order: a one-page bid summary priced by division, then the detailed estimate with every quantity under its division. Our sample estimates show real excerpts.
Where scope falls between divisions
Most bid-day surprises come from work that sits on the line between two divisions, where each trade assumes the other has it. These are the lines we check on every set:
- Concrete pads for mechanical and electrical equipment: Division 03, or carried by the mechanical or electrical subcontractor under 23 or 26?
- Firestopping at penetrations: one firestopping subcontractor under 07 84 00, or each trade sealing its own penetrations?
- Metal studs: structural cold-formed framing is Division 05, while non-structural interior framing usually comes with the drywall in Division 09.
- Roof flashing and sheet metal: by the roofer, or by a separate sheet metal subcontractor under 07 60 00?
- Power to mechanical equipment: wiring by the electrician under 26, and controls wiring by the mechanical contractor under 23 or 25?
- Blocking and backing for accessories and casework: rough carpentry in 06, or by the installer of the Division 10 and 12 items?
- Trenching and backfill for utilities: the site contractor under 31, or the plumber and electrician for their own trenches?
The specification usually settles these in Division 01, in the summary of work, and in the scope paragraphs of each section. When it doesn't, the estimate should say which way it was priced, as a labelled assumption.
05
MasterFormat and UniFormat
UniFormat is a companion standard, also from CSI and CSC, that organizes a building by systems and assemblies: substructure, shell, interiors, services, equipment and sitework. It suits early budgets, when the design shows systems but not yet products. MasterFormat organizes by work results and trades, which suits detailed estimates and bids, because that is how the work is bought.
In Canada, the National Master Specification (NMS) is organized by MasterFormat, so the same division numbers apply to Canadian tenders. See estimating for Canadian contractors.
About the author
Navtej, Chief Estimator
B.Sc. in Civil Engineering, Master's in Quantity Surveying. Runs the estimating department, sets the standards every estimate is checked against and reviews high-stakes bids.
Questions contractors ask
How many divisions are in MasterFormat?
Which CSI division is drywall?
Which CSI division is HVAC?
Which CSI division is electrical?
Is demolition in Division 2?
Keep reading
Where this guide leads.
The services and sample estimates behind this guide, and the guides that pair with it.
Next bid
Bid due soon? Send the drawings.
Send the drawings, the scope and the bid date. We reply with a quote within 30 minutes during business hours.