Flooring · CSI Division 09

Flooring takeoffs, finish code by finish code.

Flooring estimates measured from the finish plan and schedule, with every floor finish, base type and transition on its own line, so the quantities match the specification.

  • Carpet tile and broadloom carpet by finish code (SF)
  • Rubber tile and sheet rubber (SF)
  • Resilient flooring, including static-dissipative tile (SF)

What you receive

An estimate you can check line by line.

Quantities measured in PlanSwift, priced by CSI division, with the marked-up drawings attached.

  • 01

    Bid summary by CSI division

  • 02

    Detailed estimate in Excel

  • 03

    Marked-up PDF of the drawings

Scope

What we measure.

The line items and units we use for flooring estimating, taken from our own estimates for this trade.

  • Carpet tile and broadloom carpet by finish codeSF
  • Rubber tile and sheet rubberSF
  • Resilient flooring, including static-dissipative tileSF
  • Area rugs and walk-off matsSF
  • Rubber base and integral base by heightLF
  • Transition strips, by the two finishes they joinLF

Method

How we handle flooring estimating.

01

Each flooring code on the finish schedule is its own line, with manufacturer, pattern, color and size where the schedule gives them.

02

Transitions are listed by the pair of finishes they join, such as tile to rubber, so each strip type is priced correctly.

03

Base is measured by type and height.

04

Where a floor finish is not scheduled, the line is labelled as assumed.

Deliverables

What every estimate includes.

  • Bid summary priced by CSI division, with material, labor, profit, contingency and sales tax
  • Detailed estimate: each line with quantity, unit, waste factor, material and labor cost and man-hours
  • Drawing sheet and detail reference on each line
  • Marked-up PDF of the drawings from PlanSwift, showing what was measured
  • Assumed items labelled on their line
  • Excel and PDF files

Who it is for

  • Flooring contractors
  • Carpet and resilient flooring installers
  • Interior and tenant improvement contractors
  • General contractors

Projects

Flooring projects we priced.

Rooftop mechanical units measured and priced for Hanover Honda, shown on a model of the automotive dealership
E4P-014 · Hanover, MA · ≈ $3.7M

Hanover Honda

Commercial · Hanover, MA

≈ $3.7M

Comprehensive bid-ready estimate package for an automotive facility covering GC, MEP, demolition, and site-related scopes.

General ContractingMEP EstimatingSite Work+1 more
Estimate value
≈ $3.7M
Project area
Large automotive facility
Floor finishes measured and priced for Ambulatory Care Center, shown on a cutaway model of the modular clinic
E4P-020 · Camp Pendleton, CA

Ambulatory Care Center

Healthcare · Camp Pendleton, CA

Healthcare interior finishes estimate including flooring systems, paint scope, and ceiling-related takeoff.

Interior FinishesFlooringPaint+1 more
Project area
Modular healthcare facility
Turnaround
Interior finish pricing support

Recent projects, 2025–2026

Cobs Bread, Regina EastLocationSaskatchewanYear2026

Questions contractors ask us

How do you list transitions?

By the two finishes they join, for example porcelain tile to rubber tile, measured in linear feet.

Do you measure in square feet or square yards?

Areas are measured in square feet. Square yards are available for carpet if that is how you buy it.

How long does it take?

Typically 1–2 business days. Larger or more complex drawing sets can take 7–15 days. We confirm the date with the fee before work starts.

How much does it cost?

Estimating is billed at $180–$250 per estimator per day depending on project complexity. You confirm the fee for your scope before any work starts.

Flooring

Bid due soon? Send the drawings.

Send the drawings and the bid date, and we will quote the flooring estimating.