Canada
Construction estimating for Canadian contractors.
Cost estimates, quantity takeoffs and shop drawings for general contractors and subcontractors in Canada, measured in the units your drawings use and taken off to the codes and standards the set references.
- Projects in Toronto, Montreal, Vancouver, Calgary and Edmonton
- Metric or imperial, to match the drawings
- Priced by MasterFormat division
Working hours
Quotes during your working day.
Monday to Friday, 8 am to 5 pm Pacific. That is 11 am to 8 pm in Toronto and Montreal, and 9 am to 6 pm in Calgary and Edmonton.
- 01
Quote within 30 minutes during business hours
- 02
Typically 1–2 business days
- 03
Excel and PDF delivery
Where we have worked
The codes each province's drawings cite.
We have estimated projects in each of these cities, measured to the drawings and to the codes and standards the drawing set cites.
Ontario
Toronto
Ontario Building Code
Ontario drawing sets cite the Ontario Building Code, with the CSA standards named in the specifications.
Quebec
Montreal
Quebec Construction Code, Chapter I, Building
Quebec projects cite the province's Construction Code, which is based on the National Building Code with Quebec amendments.
British Columbia
Vancouver
Vancouver Building By-law and BC Building Code
The City of Vancouver has its own building by-law. The rest of the province follows the British Columbia Building Code.
Alberta
Calgary and Edmonton
National Building Code – Alberta Edition
Alberta adopts the National Building Code with its own edition, cited on drawing sets across the province.
Recent projects
16 Canadian projects from 2025 and 2026.
| Project | Scope | Province | Year |
|---|---|---|---|
| Demolition project, Red Deer | ScopeDemolition | ProvinceAlberta | Year2026 |
| St. John XXIII School renovation, Edmonton | ScopeMechanical and painting | ProvinceAlberta | Year2026 |
| Miranda Apartments, Calgary | ScopeGC and MEP | ProvinceAlberta | Year2025 |
| Brightview Mount Pleasant | ScopeElectrical | ProvinceBritish Columbia | Year2026 |
| Delano (engineered wood products) | ScopeLumber | ProvinceBritish Columbia | Year2026 |
| The Harlequin | ScopeRoofing and MEP | ProvinceBritish Columbia | Year2026 |
| Big Grassy First Nation | ScopeConcrete | ProvinceOntario | Year2026 |
| Holy Trinity | ScopeMechanical and plumbing | ProvinceOntario | Year2026 |
| Kingston Store 964 | ScopeElectrical | ProvinceOntario | Year2026 |
| Ontario Police College | ScopeGC and MEP | ProvinceOntario | Year2026 |
| Toronto Golf Club, course grounds | ScopeFraming | ProvinceOntario | Year2026 |
| Waterloo Regional Health Network | ScopeExcavation | ProvinceOntario | Year2026 |
| FreshCo Barrie | ScopePainting | ProvinceOntario | Year2025 |
| TTC Section 92 Housing, Lot 26 | ScopeDrywall | ProvinceOntario | Year2025 |
| Juvenile facility | ScopeMasonry | ProvinceQuebec | Year2026 |
| Cobs Bread, Regina East | ScopeFlooring | ProvinceSaskatchewan | Year2026 |
Method
What changes on a Canadian estimate.
Metric drawings are measured in metric units: metres, square metres, cubic metres and kilograms. Imperial drawings stay in imperial, so the units always match your drawings.
Rebar on metric drawings is taken off by metric bar size, from 10M up, and priced by mass.
Estimates stay organized by MasterFormat division, the numbering Canadian specifications use through the National Master Specification.
Codes and standards come from your drawing set: the provincial code it cites and the CSA standards in the specifications, such as CSA A23.1 for concrete, CSA S16 for steel and CSA S304 for masonry.
Sales tax is its own line, so GST, HST, PST or QST can be applied at the rate for your province.
Assumed items are labelled on their line, as on every estimate we send, so you can confirm them before the tender closes.
Services
The same estimate, for a Canadian tender.
Every service we offer US contractors is available on Canadian projects: full GC estimates with MEP, single-trade takeoffs and shop drawings. The deliverables are the same: a bid summary by division, the detailed estimate in Excel and the marked-up drawings as a PDF.
Trades
The trades we price on Canadian projects.
Almost every trade in the general contractor's scope has come up on our Canadian estimates. Each page shows what we measure for that trade; on a Canadian tender it is measured in the units your drawings use.
Division 02
Existing conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood
Division 07
Thermal and moisture protection
Division 08
Openings
Division 09
Finishes
- Drywall & Metal Stud FramingGypsum board, metal studs, track and insulation, measured by partition type.
- Acoustical CeilingsAcoustical tile and grid, gypsum ceilings and soffits, from the reflected ceiling plan.
- TileFloor and wall tile, grout, membranes, trims and transitions, by tile code.
- FlooringCarpet, resilient, rubber and sheet flooring, base and transitions, by finish code.
- Painting & CoatingsWalls, ceilings, exposed decks, doors, frames and trim, measured by paint code.
Division 10
Specialties
Divisions 22–26
Mechanical, electrical and plumbing
Questions Canadian contractors ask us
Do you work on Canadian projects?
Which trades do you estimate on Canadian projects?
Do you quote in Canadian dollars?
Can you measure in metric?
Which building codes do you follow?
Do you prepare shop drawings for Canadian projects?
When can we reach you?
How long does an estimate take?
Canada
Tender closing soon? Send the drawings.
Send the drawings, the scope and the closing date. We reply with a quote within 30 minutes during business hours.
