Doors, Windows & Hardware · CSI Division 08

Openings estimating from the door and window schedules.

Division 08 estimates built from the door, frame and window schedules, with every opening listed by its mark, size and type, and hardware, glazing and curtain wall measured with them.

  • Hollow metal doors and frames by mark, size and gauge (EA)
  • Wood doors by mark and finish (EA)
  • Aluminum storefront doors and entrances (EA)

What you receive

An estimate you can check line by line.

Quantities measured in PlanSwift, priced by CSI division, with the marked-up drawings attached.

  • 01

    Bid summary by CSI division

  • 02

    Detailed estimate in Excel

  • 03

    Marked-up PDF of the drawings

Scope

What we measure.

The line items and units we use for openings estimating, taken from our own estimates for this trade.

  • Hollow metal doors and frames by mark, size and gaugeEA
  • Wood doors by mark and finishEA
  • Aluminum storefront doors and entrancesEA
  • Curtain wall and storefront by elevation and overall sizeEA / SF
  • Automatic sliding and folding doorsEA
  • Overhead and high-speed doorsEA
  • WindowsEA
  • Door hardware setsEA

Method

How we handle openings estimating.

01

Each door is listed with its door number, size and type from the door schedule, so the estimate can be checked mark by mark.

02

Curtain wall and storefront are listed by elevation, with the doors set in them.

03

Hardware is counted by set from the hardware schedule where one is provided.

04

Where the schedule leaves out a door type, finish or hardware set, the line is labelled as assumed.

Deliverables

What every estimate includes.

  • Bid summary priced by CSI division, with material, labor, profit, contingency and sales tax
  • Detailed estimate: each line with quantity, unit, waste factor, material and labor cost and man-hours
  • Drawing sheet and detail reference on each line
  • Marked-up PDF of the drawings from PlanSwift, showing what was measured
  • Assumed items labelled on their line
  • Excel and PDF files

Who it is for

  • Door, frame and hardware suppliers
  • Glazing and storefront contractors
  • General contractors
  • Tenant improvement contractors

Projects

Doors, Windows & Hardware projects we priced.

Rooftop mechanical units measured and priced for Hanover Honda, shown on a model of the automotive dealership
E4P-014 · Hanover, MA · ≈ $3.7M

Hanover Honda

Commercial · Hanover, MA

≈ $3.7M

Comprehensive bid-ready estimate package for an automotive facility covering GC, MEP, demolition, and site-related scopes.

General ContractingMEP EstimatingSite Work+1 more
Estimate value
≈ $3.7M
Project area
Large automotive facility

Recent projects, 2025–2026

Mathilda StorefrontLocationCaliforniaYear2026

Questions contractors ask us

Do you list doors by door number?

Yes. Each line carries the door numbers from the schedule, with size, type and finish, so it can be checked against the door schedule.

Do you include curtain wall and storefront?

Yes. Curtain wall and storefront are listed by elevation, with their overall size and the doors set in them.

How long does it take?

Typically 1–2 business days. Larger or more complex drawing sets can take 7–15 days. We confirm the date with the fee before work starts.

How much does it cost?

Estimating is billed at $180–$250 per estimator per day depending on project complexity. You confirm the fee for your scope before any work starts.

Doors, Windows & Hardware

Bid due soon? Send the drawings.

Send the drawings and the bid date, and we will quote the openings estimating.