Locations · California

Construction estimating for California contractors.

Cost estimates and quantity takeoffs for general contractors and subcontractors bidding work in California, measured from your drawings and priced to the code cycle and wage rules the project falls under.

  • 13 recent California projects, named below
  • Priced to the code your drawings cite
  • Excel and PDF, typically in 1–2 business days

Working hours

Quotes during your working day.

Monday to Friday, 8 am to 5 pm Pacific, the same hours as a California office.

  • 01

    Quote within 30 minutes during business hours

  • 02

    Typically 1–2 business days

  • 03

    Excel and PDF delivery

Recent projects

13 projects we estimated in California.

From 2025 and 2026. We prepared the estimate, takeoff or shop drawings for a contractor bidding each one.

1537 S Hayworth Ave, Los AngelesScopeConcreteYear2026
Chick-fil-A, Washington & TelegraphScopeConcreteYear2026
Club Studio, Costa MesaScopeStructural steelYear2026
Dutch Bros Coffee, AnaheimScopeConcreteYear2026
Irvine Cove ResidenceScopeMillworkYear2026
Mathilda StorefrontScopeGlazingYear2026
Newport Harbor Elks LodgeScopeStructural steelYear2026
Amazon LGB8, RialtoScopeSiteworkYear2025
Club Studio, WhittierScopeStructural steelYear2025
Ross ResidenceScopeMasonryYear2025
Safe SplashScopeWaterproofingYear2025
Topanga Canyon BlvdScopeSite and landscapingYear2025
voco Pomona hotel renovationScopeMEPYear2025

Local rules

What changes on a California estimate.

Checked against the state or provincial sources in October 2026. The drawings and specification always decide what is priced.

01

The 2025 Title 24 cycle

Permit applications submitted from January 1, 2026 fall under the 2025 California Building Standards Code (Title 24). Applications received by December 31, 2025 stay on the 2022 code. We price to the edition your drawings were designed to, and label it as an assumption when the set and the permit date don't match.

02

Energy code

The 2025 Energy Code (Title 24, Part 6) applies to the same permit applications. It expands heat pumps in new homes and adds electric-readiness requirements, which changes the mechanical and electrical quantities on residential work.

03

State-reviewed projects

Hospitals, public schools and state buildings are reviewed by state agencies rather than the local building department, and their drawing sets carry those agencies' requirements. The estimate follows what the set and specification call for.

04

Prevailing wage on public works

Public works over $1,000 carry California prevailing wage, enforced by the Department of Industrial Relations, and contractors and subcontractors must register with DIR before bidding public works over $25,000. Tell us when a bid is prevailing wage: it changes the labor rates the estimate is built on.

05

Sales tax on materials

California contractors are generally the consumer of the materials they furnish and install, so tax is paid on the purchase, while fixtures they furnish and install are treated as resale (CDTFA Regulation 1521). Tax stays on its own line so you can apply the right rate.

Trades

The trades behind these California projects.

Every trade we price is available on California work, from single-trade takeoffs to full GC estimates with MEP. These are the ones on the projects above.

Questions California contractors ask us

Do you estimate projects in California?

Yes. Recent California projects include Club Studio in Whittier and Costa Mesa, Amazon LGB8 in Rialto, Dutch Bros Coffee in Anaheim and the voco Pomona hotel renovation, across concrete, steel, sitework, MEP, masonry, glazing and millwork.

Which code edition do you price to?

The one your drawings were designed to. Permit applications from January 1, 2026 fall under the 2025 Title 24 codes, and earlier applications stay on the 2022 codes.

When can we reach you?

Monday to Friday, 8 am to 5 pm Pacific. We reply with a quote within 30 minutes during business hours.

How much does an estimate cost?

Estimating is billed at $180–$250 per estimator per day, depending on project complexity. You confirm the fee for your scope before any work starts.

California

Bid due soon? Send the drawings.

Send the drawings, the scope and the bid date. We reply with a quote within 30 minutes during business hours.