Prepared estimating and takeoff support for tenant improvement work, including structural steel members, guardrails, framing components, and related metal details for a high-end fitness facility.

Structural steel and stair metalwork measured and priced for Club Studio Costa Mesa, shown on a cutaway model of the fitness club

Trade

Structural steel

Quantity lines

99

Project area

Large fitness facility

Scope

What we priced.

Tenant improvement estimating package for a high-end fitness facility with structural steel and architectural metal scope.

01

Tenant Improvement

02

Structural Steel

03

Architectural Metals

From the estimate · Division 05

Structural steel for a fitness club.

Beams, columns, plates and connections priced by weight, with anchor bolts counted, light-gauge framing in linear feet and stairs and railings itemized.

PlanSwift markup of a structural floor plan with steel beams, braces and connection plates marked in color, and a legend listing each member's length or countFull size
PlanSwift markup from the estimate. Title block, firm names and stamps removed.
  • W24x176 beam

    Sheet S2.01–S2.02 · 10% waste · 6,851.5 LBS with waste

    6,228.64 LBS

  • W18x50 beam

    Sheet S2.01–S2.02 · 10% waste · 4,125 LBS with waste

    3,750 LBS

  • W14x22 beam

    Sheet S2.01–S2.02 · 10% waste · 2,710.4 LBS with waste

    2,464 LBS

  • HSS16x16x1/2 column, 16'-9" high

    Sheet S2.01–S2.02 · 10% waste · 3,883.99 LBS with waste

    3,530.9 LBS

  • HSS4x4x3/16 beam @ 4'-0" O.C., 2'-5" long

    Sheet S2.01–S2.02 · 10% waste · 1,495.76 LBS with waste

    1,359.78 LBS

  • L3x3x1/4 bracing @ 48" O.C.

    Sheet S2.01–S2.02 · 10% waste · 144.2 LBS with waste

    131.09 LBS

  • (2'-0" x 2'-0" x 1 1/2") base plate

    Sheet S2.01–S2.02 · 10% waste · 1,078 LBS with waste

    980 LBS

  • 3/4" dia. anchor bolt, 8" embedment

    Sheet S2.01–S2.02 · 10% waste · 92.4 EA with waste

    84 EA

  • 400S137-33 ceiling joists @ 16" O.C.

    Sheet S2.01–S2.02 · 10% waste · 1,277.94 LF with waste

    1,161.77 LF

  • Stringer-mounted guardrail, 3'-6" high

    Sheet S2.01–S2.02 · 10% waste · 166.03 LF with waste

    150.94 LF

Showing 10 of 99 quantity lines in this estimate. Prices removed.

All sample estimates

Projects

More projects we priced.

See all projects
Rooftop mechanical units measured and priced for Hanover Honda, shown on a model of the automotive dealership
E4P-014 · Hanover, MA · ≈ $3.7M

Hanover Honda

Commercial · Hanover, MA

≈ $3.7M

Comprehensive bid-ready estimate package for an automotive facility covering GC, MEP, demolition, and site-related scopes.

General ContractingMEP EstimatingSite Work+1 more
Estimate value
≈ $3.7M
Project area
Large automotive facility
Retaining walls measured and priced for Ross Residence, shown on a model of the hillside residence
E4P-015 · Carlsbad, CA · $436,725

Ross Residence

Residential · Carlsbad, CA

$436,725

Residential site and retaining wall estimate covering grading, excavation, drainage, waterproofing, and wall-related scope.

ExcavationRetaining WallsWaterproofing+2 more
Estimate value
$436,725
Project area
Residential site package
Footings, piers and slab measured and priced for 2930 Carleton St, shown on a section model of the mixed-use building
E4P-018 · California, USA

2930 Carleton St

Mixed-Use · California, USA

Concrete and site development takeoff covering ramps, driveway work, slab areas, footings, piers, and drainage elements.

ConcreteFoundationsDrainage+1 more
Project area
Mixed-use site package
Turnaround
Detailed scope takeoff

Club Studio, Costa Mesa

Bid due soon? Send the drawings.

Send the drawings, the scope and the bid date. We reply with a quote within 30 minutes during business hours.