Insulation · CSI Division 07

Insulation estimates by R-value and location.

Insulation estimates measured where each product is installed, from wall cavities and slab edges to roofs, with every R-value and vapor barrier on its own line.

  • Batt and sound attenuation insulation by R-value (SF)
  • Rigid insulation at walls and slab edges (SF)
  • Polystyrene and polyiso board by thickness and R-value (SF)

What you receive

An estimate you can check line by line.

Quantities measured in PlanSwift, priced by CSI division, with the marked-up drawings attached.

  • 01

    Bid summary by CSI division

  • 02

    Detailed estimate in Excel

  • 03

    Marked-up PDF of the drawings

Scope

What we measure.

The line items and units we use for insulation estimating, taken from our own estimates for this trade.

  • Batt and sound attenuation insulation by R-valueSF
  • Rigid insulation at walls and slab edgesSF
  • Polystyrene and polyiso board by thickness and R-valueSF
  • Tapered roof insulationSF
  • Vapor barriers and retardersSF
  • Air and water barriersSF
  • Exterior insulation and finish systems (EIFS)SF

Method

How we handle insulation estimating.

01

Each product is measured where it is installed, so wall, slab-edge and roof insulation are separate lines.

02

R-value and thickness stay in the line description, so a change in the specification is easy to reprice.

03

Sound insulation in partitions is measured with the partition type it belongs to.

04

Where the drawings do not specify a product, the line is labelled as assumed.

Deliverables

What every estimate includes.

  • Bid summary priced by CSI division, with material, labor, profit, contingency and sales tax
  • Detailed estimate: each line with quantity, unit, waste factor, material and labor cost and man-hours
  • Drawing sheet and detail reference on each line
  • Marked-up PDF of the drawings from PlanSwift, showing what was measured
  • Assumed items labelled on their line
  • Excel and PDF files

Who it is for

  • Insulation contractors
  • Drywall and framing contractors
  • Building envelope contractors
  • General contractors

Projects

Insulation projects we priced.

Rooftop mechanical units measured and priced for Hanover Honda, shown on a model of the automotive dealership
E4P-014 · Hanover, MA · ≈ $3.7M

Hanover Honda

Commercial · Hanover, MA

≈ $3.7M

Comprehensive bid-ready estimate package for an automotive facility covering GC, MEP, demolition, and site-related scopes.

General ContractingMEP EstimatingSite Work+1 more
Estimate value
≈ $3.7M
Project area
Large automotive facility
Roof membrane measured and priced for Boulevard Armitage, shown on a model of the commercial building
E4P-024 · Chicago, IL

Boulevard Armitage

Commercial · Chicago, IL

Roofing-focused takeoff and pricing support for a commercial building.

RoofingExterior Envelope
Project area
Commercial roof scope
Turnaround
Roof takeoff support

Questions contractors ask us

Do you separate insulation by R-value?

Yes. Each R-value and product is its own line, measured in square feet where it is installed.

Do you include EIFS and air barriers?

Yes. EIFS, air and water barriers and vapor barriers are measured by area with the wall or roof they belong to.

How long does it take?

Typically 1–2 business days. Larger or more complex drawing sets can take 7–15 days. We confirm the date with the fee before work starts.

How much does it cost?

Estimating is billed at $180–$250 per estimator per day depending on project complexity. You confirm the fee for your scope before any work starts.

Insulation

Bid due soon? Send the drawings.

Send the drawings and the bid date, and we will quote the insulation estimating.