Canada · British Columbia
Construction estimating for British Columbia contractors.
Cost estimates and quantity takeoffs for general contractors and subcontractors tendering work in Vancouver and across British Columbia, measured in the units your drawings use and taken off to the BC Building Code 2024, the Vancouver Building By-law where it applies, and the standards the set cites.
- 3 recent British Columbia projects, named below
- Priced to the code your drawings cite
- Metric or imperial, quoted in Canadian dollars
Working hours
Quotes during your working day.
Monday to Friday, 8 am to 5 pm Pacific, the same clock as Vancouver and most of British Columbia.
- 01
Quote within 30 minutes during business hours
- 02
Typically 1–2 business days
- 03
Excel and PDF delivery
Recent projects
3 projects we estimated in British Columbia.
From 2025 and 2026. We prepared the estimate, takeoff or shop drawings for a contractor bidding each one.
| Project | Scope | Year |
|---|---|---|
| Brightview Mount Pleasant | ScopeElectrical | Year2026 |
| Delano (engineered wood products) | ScopeLumber | Year2026 |
| The Harlequin | ScopeRoofing and MEP | Year2026 |
Local rules
What changes on a British Columbia estimate.
Checked against the state or provincial sources in October 2026. The drawings and specification always decide what is priced.
BC Building Code 2024
The BC Building Code 2024 applies to projects with building permits applied for since March 8, 2024. It is based on the National Building Code of Canada 2020 with British Columbia changes, and its earthquake and adaptable dwelling provisions apply to permits applied for on or after March 10, 2025. A project designed under the 2018 code can still be permitted to it until March 8, 2027. The City of Vancouver applies its own Vancouver Building By-law. We take off to the code, edition and by-law the drawings cite.
Energy: the Step Codes
Since May 2023 most new buildings in British Columbia have had to be 20% more energy efficient than the 2018 minimums, so the lower steps of the BC Energy Step Code are now reserved in the code, and local governments may require higher steps by bylaw. Since March 10, 2025 most new buildings must also meet at least EL-1 of the Zero Carbon Step Code, and local governments may require higher levels. Envelope, glazing and mechanical quantities follow the step and compliance path the drawings show.
Electrical: the 2024 BC Electrical Code
British Columbia adopted CSA C22.1-24, the 26th edition of the Canadian Electrical Code, as the BC Electrical Code on March 4, 2025, for work permits applied for after that date. Technical Safety BC enforces it. Electrical estimates follow the edition the drawings and specifications cite.
GST and PST
British Columbia charges the 5% federal GST and a 7% provincial sales tax. A real property contractor pays PST on the goods that become part of the building and does not charge the customer PST on the contract, so PST is a material cost inside the bid rather than a line added at the end. GST stays on its own line. Tell us how you want PST shown and we follow it.
Holdback, liens and prompt payment
Under the Builders Lien Act, the party paying on a contract or subcontract retains a 10% holdback. Where a certificate of completion is issued, the holdback is released 55 days after it unless a lien is filed, and lien claims must be filed within 45 days. Owners keep a holdback account for contracts of $100,000 and more. The Construction Prompt Payment Act received Royal Assent on November 27, 2025 but was not yet in force in October 2026, so payment terms still come from the contract. The holdback changes cash flow rather than cost, so it belongs in the bid's assumptions.
Certified trades on MEP work
Since December 1, 2023, workers in seven electrical and mechanical trades, among them construction electricians, steamfitter-pipefitters, sheet metal workers, gasfitters and refrigeration and air conditioning mechanics, must be registered apprentices or certified journeypersons under Skilled Trades Certification, with no more than two apprentices per journeyperson. Mobile and tower crane operators follow on July 5, 2027. Tell us the crew mix you price with: it sets the labor rates behind the mechanical and electrical estimates.
Trades
The trades behind these British Columbia projects.
Every trade we price is available on British Columbia work, from single-trade takeoffs to full GC estimates with MEP. These are the ones on the projects above.
Priced in British Columbia
Questions British Columbia contractors ask us
Do you estimate projects in British Columbia?
Do you quote in Canadian dollars?
When can we reach you?
Which code do you take off to?
British Columbia
Tender closing soon? Send the drawings.
Send the drawings, the scope and the bid date. We reply with a quote within 30 minutes during business hours.