Demolition · CSI Division 02

Demolition estimating from the demolition plan, note by note.

Selective demolition estimates that follow the demolition plan and its keynotes, with every removal measured or counted on its own line and items to salvage kept separate.

  • Interior and exterior wall removal (SF)
  • Door, frame, window and storefront removal (EA / LF)
  • Acoustical and gypsum board ceiling removal (SF)

What you receive

An estimate you can check line by line.

Quantities measured in PlanSwift, priced by CSI division, with the marked-up drawings attached.

  • 01

    Bid summary by CSI division

  • 02

    Detailed estimate in Excel

  • 03

    Marked-up PDF of the drawings

Scope

What we measure.

The line items and units we use for demolition estimating, taken from our own estimates for this trade.

  • Interior and exterior wall removalSF
  • Door, frame, window and storefront removalEA / LF
  • Acoustical and gypsum board ceiling removalSF
  • Floor finish removal, including adhesiveSF
  • Roofing assembly and metal deck removalSF
  • Slab and footing removalCY / LF
  • Asphalt, sidewalk and curb removalSF / LF
  • Millwork, furniture and fixture removalLF / EA
  • Slab patch and repair after removalSF

Method

How we handle demolition estimating.

01

Each removal follows the demolition keynote it comes from, and the note number stays on the line so you can check it against the plan.

02

Items to be salvaged, such as door hardware, are separate lines from items that are removed.

03

Patching and repair after removal is priced on its own line.

04

Where the drawings say verify in field, the line says so, so the quantity can be confirmed on site before you bid.

Deliverables

What every estimate includes.

  • Bid summary priced by CSI division, with material, labor, profit, contingency and sales tax
  • Detailed estimate: each line with quantity, unit, waste factor, material and labor cost and man-hours
  • Drawing sheet and detail reference on each line
  • Marked-up PDF of the drawings from PlanSwift, showing what was measured
  • Assumed items labelled on their line
  • Excel and PDF files

Who it is for

  • Demolition contractors
  • General contractors on renovation work
  • Tenant improvement contractors
  • Owners planning a renovation

Projects

Demolition projects we priced.

Rooftop mechanical units measured and priced for Hanover Honda, shown on a model of the automotive dealership
E4P-014 · Hanover, MA · ≈ $3.7M

Hanover Honda

Commercial · Hanover, MA

≈ $3.7M

Comprehensive bid-ready estimate package for an automotive facility covering GC, MEP, demolition, and site-related scopes.

General ContractingMEP EstimatingSite Work+1 more
Estimate value
≈ $3.7M
Project area
Large automotive facility

Recent projects, 2025–2026

Demolition project, Red DeerLocationAlbertaYear2026

Questions contractors ask us

Do you follow the demolition keynotes?

Yes. Each removal is a separate line with its keynote number, so the quantities can be checked against the demolition plan note by note.

How do you handle items marked verify in field?

We measure what the drawings show and mark the line verify in field, so you know which quantities to confirm on site before you bid.

Do you separate salvage from removal?

Yes. Items the drawings mark for salvage or reuse, such as existing door hardware, are separate lines from items that are removed.

How long does it take?

Typically 1–2 business days. Larger or more complex drawing sets can take 7–15 days. We confirm the date with the fee before work starts.

How much does it cost?

Estimating is billed at $180–$250 per estimator per day depending on project complexity. You confirm the fee for your scope before any work starts.

Demolition

Bid due soon? Send the drawings.

Send the drawings and the bid date, and we will quote the demolition estimating.