Canada · Ontario
Construction estimating for Ontario contractors.
Cost estimates and quantity takeoffs for general contractors and subcontractors tendering work in Ontario, measured in the units your drawings use and taken off to the 2024 Ontario Building Code and the standards the set cites.
- 8 recent Ontario projects, named below
- Priced to the code your drawings cite
- Metric or imperial, quoted in Canadian dollars
Working hours
Quotes during your working day.
Monday to Friday, 8 am to 5 pm Pacific, which is 11 am to 8 pm in Toronto.
- 01
Quote within 30 minutes during business hours
- 02
Typically 1–2 business days
- 03
Excel and PDF delivery
Recent projects
8 projects we estimated in Ontario.
From 2025 and 2026. We prepared the estimate, takeoff or shop drawings for a contractor bidding each one.
| Project | Scope | Year |
|---|---|---|
| Big Grassy First Nation | ScopeConcrete | Year2026 |
| Holy Trinity | ScopeMechanical and plumbing | Year2026 |
| Kingston Store 964 | ScopeElectrical | Year2026 |
| Ontario Police College | ScopeGC and MEP | Year2026 |
| Toronto Golf Club, course grounds | ScopeFraming | Year2026 |
| Waterloo Regional Health Network | ScopeExcavation | Year2026 |
| FreshCo Barrie | ScopePainting | Year2025 |
| TTC Section 92 Housing, Lot 26 | ScopeDrywall | Year2025 |
Local rules
What changes on a Ontario estimate.
Checked against the state or provincial sources in October 2026. The drawings and specification always decide what is priced.
2024 Ontario Building Code
The 2024 Ontario Building Code has been in force since January 1, 2025. It is based on the 2020 National Building Code of Canada with Ontario amendments, and it was amended again in 2026. We take off to the edition and amendments the drawings cite.
Energy: SB-10 and SB-12
Non-residential buildings follow Supplementary Standard SB-10, and houses follow SB-12. Electrically heated buildings, including heat-pump buildings, must meet the Climate Zone 7 envelope values, which raises insulation and glazing requirements.
Metric drawings, metric takeoffs
Metric drawings are measured in metres, square metres, cubic metres and kilograms, and rebar by metric bar size from 10M up. Imperial drawings stay in imperial.
HST
Ontario's HST is 13%. It stays on its own line, so you can see the estimate before and after tax.
Fair wages on City of Toronto work
City of Toronto construction contracts carry the City's Fair Wage Policy, which sets wage schedules for ICI, road, sewer and watermain work. Tell us when a tender falls under it: it changes the labor rates the estimate is built on.
Trades
The trades behind these Ontario projects.
Every trade we price is available on Ontario work, from single-trade takeoffs to full GC estimates with MEP. These are the ones on the projects above.
Questions Ontario contractors ask us
Do you estimate projects in Ontario?
Do you quote in Canadian dollars?
When can we reach you?
Which code do you take off to?
Ontario
Tender closing soon? Send the drawings.
Send the drawings, the scope and the bid date. We reply with a quote within 30 minutes during business hours.
