Canada · Ontario

Construction estimating for Ontario contractors.

Cost estimates and quantity takeoffs for general contractors and subcontractors tendering work in Ontario, measured in the units your drawings use and taken off to the 2024 Ontario Building Code and the standards the set cites.

  • 8 recent Ontario projects, named below
  • Priced to the code your drawings cite
  • Metric or imperial, quoted in Canadian dollars

Working hours

Quotes during your working day.

Monday to Friday, 8 am to 5 pm Pacific, which is 11 am to 8 pm in Toronto.

  • 01

    Quote within 30 minutes during business hours

  • 02

    Typically 1–2 business days

  • 03

    Excel and PDF delivery

Recent projects

8 projects we estimated in Ontario.

From 2025 and 2026. We prepared the estimate, takeoff or shop drawings for a contractor bidding each one.

Big Grassy First NationScopeConcreteYear2026
Holy TrinityScopeMechanical and plumbingYear2026
Kingston Store 964ScopeElectricalYear2026
Ontario Police CollegeScopeGC and MEPYear2026
Toronto Golf Club, course groundsScopeFramingYear2026
Waterloo Regional Health NetworkScopeExcavationYear2026
FreshCo BarrieScopePaintingYear2025
TTC Section 92 Housing, Lot 26ScopeDrywallYear2025

Local rules

What changes on a Ontario estimate.

Checked against the state or provincial sources in October 2026. The drawings and specification always decide what is priced.

01

2024 Ontario Building Code

The 2024 Ontario Building Code has been in force since January 1, 2025. It is based on the 2020 National Building Code of Canada with Ontario amendments, and it was amended again in 2026. We take off to the edition and amendments the drawings cite.

02

Energy: SB-10 and SB-12

Non-residential buildings follow Supplementary Standard SB-10, and houses follow SB-12. Electrically heated buildings, including heat-pump buildings, must meet the Climate Zone 7 envelope values, which raises insulation and glazing requirements.

03

Metric drawings, metric takeoffs

Metric drawings are measured in metres, square metres, cubic metres and kilograms, and rebar by metric bar size from 10M up. Imperial drawings stay in imperial.

04

HST

Ontario's HST is 13%. It stays on its own line, so you can see the estimate before and after tax.

05

Fair wages on City of Toronto work

City of Toronto construction contracts carry the City's Fair Wage Policy, which sets wage schedules for ICI, road, sewer and watermain work. Tell us when a tender falls under it: it changes the labor rates the estimate is built on.

Trades

The trades behind these Ontario projects.

Every trade we price is available on Ontario work, from single-trade takeoffs to full GC estimates with MEP. These are the ones on the projects above.

Questions Ontario contractors ask us

Do you estimate projects in Ontario?

Yes. Recent Ontario projects include the Ontario Police College, Waterloo Regional Health Network, Toronto Golf Club, FreshCo Barrie and Kingston Store 964, across GC and MEP, excavation, framing, painting, electrical and concrete.

Do you quote in Canadian dollars?

Yes. Canadian projects are quoted in Canadian dollars, at the same rate as US work: $180–$250 (USD) per estimator per day, depending on project complexity.

When can we reach you?

Monday to Friday, 8 am to 5 pm Pacific, which is 11 am to 8 pm in Toronto. We reply with a quote within 30 minutes during business hours.

Which code do you take off to?

The one your drawing set cites: for current Ontario work, the 2024 Ontario Building Code and the CSA standards in the specifications.

Ontario

Tender closing soon? Send the drawings.

Send the drawings, the scope and the bid date. We reply with a quote within 30 minutes during business hours.