Projects · Industrial

E4P-017 · Lake Alfred, FL

Lake Alfred Project

Lake Alfred, FL · 2025

Prepared a roof-focused estimating package for an industrial facility, covering TPO roof systems, parapet conditions, coping-related scope, drainage accessories, and related roof components.

TPO roof membrane measured and priced for Lake Alfred Project, shown on a model of the industrial building

Trade

Roofing

Quantity lines

12

Project area

Large industrial roof area

Scope

What we priced.

Industrial roofing estimate package including TPO membrane, parapet wall scope, gutters, downspouts, and roof accessories.

01

Roofing

02

TPO Roofing

03

Sheet Metal

04

Exterior Envelope

From the estimate · Division 07

A 115,000 sq ft TPO roof on an industrial building.

Roof area, insulation, flashing, gutters and downspouts measured from the roof plan and details. The cover board was not shown on the drawings, so the line says it is assumed.

PlanSwift markup of an industrial roof plan with the TPO roof area shaded and 23 downspouts marked, and a legend listing each quantityFull size
PlanSwift markup from the estimate. Title block, firm names and stamps removed.
  • TPO single-ply 60 mil roofing system

    Sheet AR-101, A-205 · 10% waste · 133,051.18 SF with waste

    120,955.62 SF

  • R-19 rigid insulation

    Sheet AR-101, A-205 · 10% waste · 126,401.68 SF with waste

    114,910.62 SF

  • 1/2" cover boardAssumed

    Sheet AR-101, A-205 · 10% waste · 126,401.68 SF with waste

    114,910.62 SF

  • TPO bonding adhesive

    Sheet AR-101, A-205 · 10% waste · 133,051.18 SF with waste

    120,955.62 SF

  • 5.5" TPO seam flashing

    Sheet AR-101, A-205 · 10% waste · 629.05 LF with waste

    571.86 LF

  • Cant flashing

    Sheet AR-101, A-205 · 10% waste · 1,071.4 LF with waste

    974 LF

  • Pre-finished aluminum gutter

    Sheet AR-101, A-205 · 10% waste · 629.05 LF with waste

    571.86 LF

  • Pre-finished aluminum downspouts, 37 ft high (23 EA), with guards

    Sheet AR-101, A-205 · 10% waste · 936.1 LF with waste

    851 LF

  • Continuous bead of TPO sealant

    Sheet AR-101, A-205 · 10% waste · 1,594.69 LF with waste

    1,449.72 LF

Showing 9 of 12 quantity lines in this estimate. Prices removed.

All sample estimates

Projects

More projects we priced.

See all projects
Rooftop mechanical units measured and priced for Hanover Honda, shown on a model of the automotive dealership
E4P-014 · Hanover, MA · ≈ $3.7M

Hanover Honda

Commercial · Hanover, MA

≈ $3.7M

Comprehensive bid-ready estimate package for an automotive facility covering GC, MEP, demolition, and site-related scopes.

General ContractingMEP EstimatingSite Work+1 more
Estimate value
≈ $3.7M
Project area
Large automotive facility
Retaining walls measured and priced for Ross Residence, shown on a model of the hillside residence
E4P-015 · Carlsbad, CA · $436,725

Ross Residence

Residential · Carlsbad, CA

$436,725

Residential site and retaining wall estimate covering grading, excavation, drainage, waterproofing, and wall-related scope.

ExcavationRetaining WallsWaterproofing+2 more
Estimate value
$436,725
Project area
Residential site package
Structural steel and stair metalwork measured and priced for Club Studio Costa Mesa, shown on a cutaway model of the fitness club
E4P-016 · Costa Mesa, CA

Club Studio, Costa Mesa

Commercial · Costa Mesa, CA

Tenant improvement estimating package for a high-end fitness facility with structural steel and architectural metal scope.

Tenant ImprovementStructural SteelArchitectural Metals
Project area
Large fitness facility
Turnaround
Detailed TI bid support

Lake Alfred Project

Bid due soon? Send the drawings.

Send the drawings, the scope and the bid date. We reply with a quote within 30 minutes during business hours.