Shop drawings · CSI Divisions 21–28

MEP coordination, modeled before it clashes in the field.

Coordination drawings for MEP contractors and general contractors, with every trade modeled together in Revit, clashes found and worked through, and coordinated plans issued for each trade.

  • Coordination model
  • Clash reports
  • Coordinated trade plans

What you receive

A drawing set ready for your submittal.

Drafted in Revit and AutoCAD, with anything the contract drawings leave open listed for your RFIs.

  • 01

    PDF set for submittal

  • 02

    Native DWG or RVT files

  • 03

    Imperial or metric units

Drawing set

What the set includes.

The sheets in a typical set of MEP coordination drawings. The exact list follows your contract drawings and specification section.

  • Coordination modelDuct, piping, sprinkler, plumbing, electrical and structure in one Revit model.
  • Clash reportsEach clash with its location, the trades involved and the proposed resolution.
  • Coordinated trade plansPlans for each trade, cut from the coordinated model.
  • SectionsSections at congested ceilings, corridors and shafts.
  • Penetration and sleeve plansSleeves and openings through slabs and walls.
  • Ceiling space studiesThe space left above the ceiling, area by area.

Method

How we prepare MEP coordination drawings.

01

Trades are modeled to the level of detail agreed at the start, so the clash check means something.

02

Clashes are grouped and resolved trade by trade, and each decision is recorded.

03

Coordinated plans are issued per trade with elevations, so each crew installs in its own zone.

04

Questions only the designers can answer are listed for you to raise as RFIs.

Standards

The references your reviewer expects.

We draft to the standards your contract drawings and specification cite. These are the ones we see most often for this trade.

BIMForum LOD Specification

Defines the level of detail, such as LOD 350 or 400, each model element is built to.

Each trade's own standards

SMACNA for duct, NFPA 13 for sprinklers, and the plumbing and electrical codes the drawings reference.

Deliverables

What every set includes.

  • PDF drawing set, ready for your submittal
  • Native files: DWG from AutoCAD or RVT from Revit
  • A list of open questions and conflicts, for you to raise as RFIs
  • Revisions to the reviewer's comments, recorded in the title block
  • Imperial or metric units, to match the contract drawings
  • Drafted in Revit and AutoCAD

Who it is for

  • MEP contractors
  • General contractors
  • Design-build teams
  • Construction managers

Questions contractors ask us

Which software do you coordinate in?

Revit. Trades are modeled together and checked for clashes in the same model, and drawings are issued from it in PDF and DWG.

Can you model from 2D trade drawings?

Yes. If a trade only has 2D shop drawings, we model it from those so it can be checked against the others.

What level of detail do you model to?

The level the project's BIM requirements set, usually LOD 350 for coordination and LOD 400 where trades fabricate from the model. We agree it before modeling starts.

Are the shop drawings stamped?

Shop drawings are submittals: the architect or engineer of record reviews and approves them. If your project needs a professional engineer's stamp, for example on delegated design, tell us at the quote stage and we will confirm what can be arranged for that project.

How are shop drawings priced?

We review the contract drawings and the specification section, then confirm the fee and the delivery date before any drafting starts.

MEP Coordination shop drawings

Submittal due soon? Send the contract set.

Send the contract drawings, the specification section and the submittal date, and we will quote the MEP coordination drawings.